Show Navigation
back to search results

Beckton Sewage Treatment Works Northern Outfall & Barking Creek Tidal Barrier

Clean water flows into the Thames from the northern outfall of Thames Water's, Beckton Sewage Treatment Works. Sewage from 3.4 million Londoners is treated on site every day. Barking Creek Tidal Barrier resembling a giant guillotine was built over a period of four years, being completed in 1983. It is about 60 metres high, and was needed to be this size to allow shipping to reach the Town Quay in Barking further upstream. The barrier crosses the Barking Creek reach of the River Roding, at its confluence with the River Thames.

Add to Cart Download
Filename
ThamesWater_QL-22.tif
Copyright
Quintin Lake
Image Size
3693x2457 / 10.8MB
Beckton Sewage Treatment Works Blue Sky Day Engineering Environmnet Agency External Infrastructure London Northen outfall Sewage Sewer Thames Water Waste
Contained in galleries
Thames Water Northern Outfall: Abbey Mills Pumping Station & Beckton Sewage Treatment Works
Clean water flows into the Thames from the northern outfall of Thames Water's, Beckton Sewage Treatment Works. Sewage from 3.4 million Londoners is treated on site every day. Barking Creek Tidal Barrier resembling a giant guillotine was  built over a period of four years, being completed in 1983. It is about 60 metres high, and was needed to be this size to allow shipping to reach the Town Quay in Barking further upstream. The barrier crosses the Barking Creek reach of the River Roding, at its confluence with the River Thames.
Prev Next
Info
  • Facebook
  • Twitter
x

Quintin Lake Photography

  • BUY PRINTS
  • BLOG: THE PERIMETER
  • BLOG: GEOMETRY & SILENCE
  • ABOUT
  • CLIENTS
  • AWARDS
  • EXHIBITIONS
  • TALKS
  • TV & RADIO
  • CONTACT